Extensions to the Broome International Airport
The Broome International Airport was a very challenging site to construct due to the ongoing traffic of people and vehicles in the area. However, the kit system enabled us to speed up the building process resulting in a coordinated, smoothly run, cost-effective project.
The Airport was designed for maximum use of all areas, providing a new Broome style departure terminal including a new bar, gallery and souvenir shop, together with a new car park pick-up and set-down areas to cater for growing tourist numbers in Broome. Features of our commercial developments include:
- working closely with the architects to perfect the design and adapt quickly to any changes needed during construction;
- use of computer generated 3D graphics and steelwork modelling which enabled precise manufacture of steelwork and a short erection time awarding individual style to each project by utilising and maximising the natural ‘capital’ of each building site;
- using local materials wherever possible.
 |
Shiba Lane, Broome
a multi-residential/commercial development comprising of 20 luxury units and 8 commercial offices. The project has two separate buildings built around a Japanese Garden Precinct in the centre of Chinatown.
Master Builders Association Award Winner 2006 |
Coghlan Street Offices
2 large commercial offices, located close to the airport and town centre.
Norwest Tackle
Two storey retail fishing outlet and office in traditional Chinatown balustrade and colour scheme
Completed in October 2006 |

|
Cable Beach Club Bunaglow Upgrades Stage 1 & Stage 2
Renovations to 14 bungalows and swimming pool area in Stage One and Upgrade to Cable Beach Club (internal & external works). |