Eco Constructions logo




Structural Steel System
For Residential, Commercial or Cabins


  • Structural portal steel frames incorporating floors system.
  • Hot dipped galvanized (optional)
  • System uses high tensile steel to give unique strength.
  • Computer generated 3d installation drawings.
  • Bolted connections enabling fast erection time.
  • System designed to be erected by minimal skilled labour.
  • Unique steel design systems that can be erected on any site regardless of conditions e.g. sand dunes, rocky outcrops or steep sloping sites.
  • Eco friendly steel systems with minimal disturbance to natural grounds.

 

RESIDENTIAL

 
  Step 1 - Set out site and drill holes
 
Step 2 – Drop in cages

 
3 – Survey cages to position

Step 4 – Cages set out within a few mm

 
Step 5 – Bolt together steel kit

 
Step 6 – House is ready for roof within 1 week from setout.

 
Step 6 – House is ready for roof within 1 week from setout.

 
Step 7 – High roof can be craned up – no need for scaffold.


 
Step 8 – Structure finished.
 

 

CABINS & TENTED STRUCTURES (CONFERENCE FACILITY)

 
  Step 1 & 2 – Set out site, drill holes, drop cages

 
Step 3 & 4 – Survey cages to position (cages set out within few mm)

 
Step 5 – Bolt together steel kit system



Step 6 – Decking, balistrade and roof structure completed.

 
Step 7 – Completed Conference facility structure.